Working Group · CMS 2026

Weekly reports

Progress reports by week from the Working Group start (18 Sep 2026) through the current week. Formal PDF/HTML packs begin 3 Oct; earlier weeks are reconstructed from repository history and SDD baselines.

Accumulated progress (W01–W04)

Headline composite at end of W04: average of Platform readiness and FE Demo depth. Checklist Live stays at 0% until durable CMS-backed journeys pass acceptance (Demo ≠ Live).

Overall (cumulative) ~54% End of W04 · 10 Oct
Platform readiness ~72% Architecture · schema · pilot · API
FE Demo depth ~36% 37 of 103 applicable (Demo/Partial)
Checklist Live 0% 0 of 112 rows Live

Week contributions to overall: W01 +23 · W02 +15 · W03 +8 · W04 +8 = ~54% accumulated. Method matches Overview · Project progress cuts (18 Sep → 7 Oct engineering; W04 pack refreshed morning 10 Oct).

By week — summary & cumulative %

Accumulation table

Week Summary Added Cumulative overall
W01
18–19 September 2026
Kickoff and baseline inventory. Architecture / ADR context open; student Demo/Partial already on the sheet (~31% FE). No Live checklist rows. +23 pts ~23%
P ~15% · FE ~31% · Live 0%
W02
20–26 September 2026
Shared design-system and portal shells landed; Portal API split; Applicant shell started. Platform jumps on schema/API work; FE sheet still flat at 31%. +15 pts ~38%
P ~45% · FE ~31% · Live 0%
W03
27 September – 3 October 2026
Lesotho confirmed as first pilot; Demo host live; docs/campus baselines deepen. Platform ~60%; FE still sheet-flat; Live still 0%. +8 pts ~46%
P ~60% · FE ~31% · Live 0%
W04
4–10 October 2026
Morning 10 Oct cut: hosted Applicant/Student Demo on Portal API; fee/finance YAML + cross-campus amounts; Weekly reports hub. Live still 0%. +8 pts ~54%
P ~72% · FE ~36% · Live 0%
Total accumulated (end W04) +54 pts ~54%
Live still 0% — not included in overall average